For a large power generation project based in the Middle East, Hyspecs have supplied 33 hydraulic powerunits with interconnecting pipework and assisted our customer to pass factory acceptance tests.
Custom designed and built pontoon for excavating underground grey water tunnel floors, throughout the NSW water network.
As part of a town Wastewater upgrade Hyspecs supplied hydraulic powerunits, local control panels and interconnecting pipework to three sets of pinch valve trains.
Wednesday, March 27, 2024 12:20 PM — Hyspecs Hydraulics
Monday, March 11, 2024 8:52 AM — Hyspecs Hydraulics
YOU NEED JAVASCRIPT TO RUN THIS SITE. PLEASE ENABLE JAVASCRIPT IN YOUR INTERNET OPTIONS.